TotalEnergies takes FID on Absheron full-field development, lifting output to 6 BCMA by 2029
Bitget2026/09/28 06:07- TotalEnergies took final investment decision on full-field development of Azerbaijan’s Absheron gas-condensate field with SOCAR, XRG.
- Project targets output of 6 BCMA of gas, 47,000 bpd of condensate; start-up expected in 2029.
- Absheron holds about 140 billion cubic meters of recoverable gas reserves; first phase began production in 2023.
- Volumes slated for Azerbaijan’s domestic market, exports to Turkey via existing infrastructure linked to the European gas market.
- TotalEnergies holds 35% as operator; SOCAR holds 35%; XRG holds 30%.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
Former Chainlink Product Marketing Director Michael Robinson joins Monad Foundation
The Federal Reserve Eyes $1.8 Trillion in “Shadow Credit”: Dallas and New York Fed Launch First Private Credit Survey
The Dallas and New York Federal Reserves have launched an investigation into private credit lending standards, covering an industry worth 1.8 trillions USD, with a minimum threshold of 50 millions USD. The results will be released in the first quarter of 2027.

Tom Lee Says a VIX Signal Points to a Stock Market Bottom

Is AI an engine or a killer? Morgan Stanley provides answers with data: productivity soars, but nearly 90% of the benefits are taken by 12 industries
Morgan Stanley stated that the productivity dividends from AI are concentrated in 12 highly exposed industries, with growth rates reaching twice the twenty-year average. For the first time, signs of job replacement have emerged.
