Montage Gold achieves first gold pour at Côte d’Ivoire Koné mine ahead of schedule
Bitget2026/09/27 22:18- Montage Gold achieved first gold pour at its Koné mine in Côte d’Ivoire on Sept. 26, 2026, ahead of Q2 2027.
- The pour yielded about 1,140 ounces; more than 400,000 tonnes of ore have been processed since Sept. 8, 2026.
- Oxide circuit ramp-up targets commercial production in Q4 2026; hard-rock comminution circuit completion remains slated for Q2 2027.
- Construction began in December 2024; the build created about 3,600 jobs, with over 95% filled by nationals.
- A 130,000-meter 2026 drilling program is underway; probable reserves in the 2024 feasibility study were 4.01 Moz at 0.72 g/t Au.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
Bank of Japan minutes turn hawkish: Most members believe a rate hike is needed soon, with a 70% probability of a hike in December
Minutes from the Bank of Japan show that several members believe a rate hike is needed in the near term, with a roughly 70% probability of an increase in December. Core inflation has met the target for the first time in 30 years, and the current policy rate stands at 1.25%.

Former Chainlink Product Marketing Director Michael Robinson joins Monad Foundation
The Federal Reserve Eyes $1.8 Trillion in “Shadow Credit”: Dallas and New York Fed Launch First Private Credit Survey
The Dallas and New York Federal Reserves have launched an investigation into private credit lending standards, covering an industry worth 1.8 trillions USD, with a minimum threshold of 50 millions USD. The results will be released in the first quarter of 2027.

Tom Lee Says a VIX Signal Points to a Stock Market Bottom
