Bitcoin miner CleanSpark's BTC treasury surpasses $1 billion in Q3 2025 as revenue surges 91% year-over-year
Quick Take CleanSpark said its Q3 revenue jumped 91% year-over-year to $198.6 million while net income reached $257.4 million.
Las Vegas-based bitcoin miner CleanSpark (ticker CLSK) has reported notable growth in its fiscal third-quarter earnings report, with revenue jumping 91% year-over-year to $198.6 million. Moreover, adjusted EBITDA increased to $377.7 million, up significantly from a loss of $12.6 million from the same period a year ago.
"This was the most successful quarter in CleanSpark's history, and it reflects the strength of our strategy, the discipline of our execution, and the tireless commitment of our team," said Zach Bradford, CEO of CleanSpark, in a statement .
The firm’s net income for the three months ending June 30 reached $257.4 million. Net income can exceed revenue due to non-operating income, such as gains from asset sales, investments, or one-time events, which are included in net income but not in revenue.
CleanSpark also uses an adjusted EBITDA metric that does not follow generally accepted accounting principles (GAAP). The firm noted that it previously excluded non-cash impairment losses on bitcoin and realized gains and losses on sales of bitcoin, “but has determined such items are part of the Company's normal ongoing operations and will no longer be excluding them from its calculation of adjusted EBITDA.”
Bitcoin rose about 26% to about $109,000 in June from around $86,500 at the start of CleanSpark's third quarter in April, giving many mining firms a modest boost in quarterly revenues and earnings . Previous monthly statements noted the firm sold 578.51 BTC in June , 293.50 BTC in May , and 401.39 BTC in April .
Somewhat unusually, CleanSpark ends its third quarter on June 30, which is typically part of a public firm’s Q2 reporting period.
The company said its hashing power reached 50 EH/s in Q3, which accounts for 5.8% of global hashrate. Bradford noted CleanSpark is the first public company to have reached that level “exclusively with American infrastructure.”
Further, its bitcoin treasury exceeded the $1 billion mark in Q3, in part through the rising price of bitcoin as well as its increased holdings. In all, it has about $3.1 billion in total assets, including $1.08 billion worth of bitcoin, $985 million worth of mining assets, and $34.6 million in cash against total liabilities and debt of about $1 billion.
CLSK dropped about 2% to $10.74 by market close from an opening price above $11, according to The Block's data page .
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
How much CPO demand will Nvidia Rubin Ultra generate? Bernstein: Optical value per Pod will increase fivefold
Bernstein believes that the co-packaged optics (CPO) and fiber demand driven by Nvidia's Rubin Ultra architecture will surge significantly, with the optical content per Pod rising from $1 million to $5.4 million. This will propel the size of Nvidia's optical ecosystem market to $46.8 billion by 2028 (a 91% annual increase). Although the industry faces supply bottlenecks with InP substrates, the outlook remains positive. The institution reiterates its “outperform” rating for Lumentum, Coherent, and Ciena.

UBS Q3 implements a two-way strategy with gold options, heavily invests in technology stocks, and builds positions in SK Hynix (SKHY.US)
UBS Group (UBS.US) has submitted its Q3 holdings report (13F) as of September 30, 2026.

SpaceX (SPCX.US) reportedly attempts “de-Nvidiaization” at the rack level: developing Kessel cabinets to bypass L6 compute boards, purchasing only chips
SemiAnalysis: SpaceX has developed its own Kessel cabinet, bypassing Nvidia's L6 cards to provide more options for manufacturing its own hardware.

$3.7 billion “data center power equipment prepayments” abandoned! What did "the most active buyer of gas turbines", SoftBank, see?
In the second quarter of fiscal year 2026, SoftBank reported a net loss of $7.1 billion, primarily due to a $3.7 billion impairment charge from a $9.5 billion advance payment for power generation equipment for US data centers—of which about $2.9 billion was non-refundable and effectively lost. The CFO admitted that SoftBank placed orders before the project plan was finalized, and is now conducting a comprehensive review of its procurement strategy. "The most aggressive purchaser of gas turbines has now written off the deposit in this way."
