Mill City acquires 76.3M SUI following $450M raise amid push for Sui corporate strategy
Mill City Ventures has acquired 76.3 million SUI tokens following the close of a $450 million private placement, becoming the first publicly listed company to launch a crypto treasury strategy backed by the Sui Foundation.
According to a July 31 press release , Mill City partnered with hedge fund Karatage and received an equivalent investment from the Sui ( SUI ) Foundation to kick off the initiative.
The firm’s new SUI holdings, acquired at an average price of $3.6389, are now held in a public wrapper offering retail and institutional investors daily liquidity.
Institutional access to Sui begins
Mill City’s treasury now holds over $277 million in SUI and plans to continue accumulation through over-the-counter and open market purchases. The strategy allows investors to gain direct exposure to the Sui network via a listed vehicle, positioning the firm as a unique access point for capital markets participants.
The deal was led by Karatage co-founders Marius Barnett and Stephen Mackintosh, who have joined Mill City as chairman and chief investment officer, respectively. Galaxy Asset Management will oversee the treasury’s operations, while other major participants include Pantera, Electric Capital, ParaFi, and Big Brain Holdings.
Sui is viewed as a blockchain built for mainstream use, with early institutional traction in stablecoins, gaming , and AI applications. Mill City’s collaboration with the foundation allows it to align with the network’s roadmap while building the largest institutionally managed SUI position on public markets.
“Our Sui strategy is about more than passively holding tokens; it’s about actively partnering with the ecosystem to maximize long-term value creation,” said Mackintosh.
Competitive positioning and SUI momentum
Mill City’s SUI holdings now exceed those of DeFi Technologies and Lion Group, two other listed firms with notable Sui allocations. DeFi Technologies holds 4.91 million SUI, valued at about $17 million, while Lion Group’s reserve includes 1.01 million SUI worth $3.09 million.
The treasury model builds on growing interest in Sui as a next-generation layer 1 with scalable infrastructure and a developer base originating from Meta’s Diem project. With foundational backing and top-tier asset managers involved, Mill City’s move could establish a standard for future institutional SUI treasuries.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
How much CPO demand will Nvidia Rubin Ultra generate? Bernstein: Optical value per Pod will increase fivefold
Bernstein believes that the co-packaged optics (CPO) and fiber demand driven by Nvidia's Rubin Ultra architecture will surge significantly, with the optical content per Pod rising from $1 million to $5.4 million. This will propel the size of Nvidia's optical ecosystem market to $46.8 billion by 2028 (a 91% annual increase). Although the industry faces supply bottlenecks with InP substrates, the outlook remains positive. The institution reiterates its “outperform” rating for Lumentum, Coherent, and Ciena.

UBS Q3 implements a two-way strategy with gold options, heavily invests in technology stocks, and builds positions in SK Hynix (SKHY.US)
UBS Group (UBS.US) has submitted its Q3 holdings report (13F) as of September 30, 2026.

SpaceX (SPCX.US) reportedly attempts “de-Nvidiaization” at the rack level: developing Kessel cabinets to bypass L6 compute boards, purchasing only chips
SemiAnalysis: SpaceX has developed its own Kessel cabinet, bypassing Nvidia's L6 cards to provide more options for manufacturing its own hardware.

$3.7 billion “data center power equipment prepayments” abandoned! What did "the most active buyer of gas turbines", SoftBank, see?
In the second quarter of fiscal year 2026, SoftBank reported a net loss of $7.1 billion, primarily due to a $3.7 billion impairment charge from a $9.5 billion advance payment for power generation equipment for US data centers—of which about $2.9 billion was non-refundable and effectively lost. The CFO admitted that SoftBank placed orders before the project plan was finalized, and is now conducting a comprehensive review of its procurement strategy. "The most aggressive purchaser of gas turbines has now written off the deposit in this way."
